Modular AI data center deployment in Texas

Modular AI infrastructure

Zero grid. Zero municipal water. All Texas.

The only modular AI data center EPC in Texas that builds behind the meter, cools with atmospheric water, and ships in 90 days.

PUE 1.15 targetWUE 0 from municipal supply90-day deployment10–50 MW modular blocks

The thesis

The AI build-out is colliding with two limits Texas knows well.

A stressed grid and finite water. We resolve both at the source — solar generation behind the meter, atmospheric water from the air, and modular compute next to where the energy is made.

01

Behind-the-meter

Each block runs primarily on dedicated solar + storage with grid as backup, not primary supply. ERCOT exposure becomes optional, not foundational.

02

Atmospheric water

Cooling water is generated on-site from ambient humidity via Aquaria units. Zero draw on aquifers or municipal supply.

03

Modular by design

Each block is a self-contained 40-foot module. Capacity scales by adding blocks, not by overbuilding day one.

04

Texas-native

Site selection, county filings, ERCOT interconnection, and labor — all in Texas, by Texans.

05

Single EPC

We design, procure, build, and operate the full stack. No GC stitching three vendors together.

06

Veteran-led

Founded by an Army Engineer Captain. Project execution runs like an operations order.

Integrated solar + storage + AWG + compute deployment

The architecture

One pad. Four utilities.
All under one EPC.

Solar generation. Battery storage. Atmospheric water. Modular compute. Designed as a single integrated system, with a single point of contract and a single phone number to call.

Detailed specifications

System specifications

Reference deployment numbers.

A representative 10 MW campus on a 25-acre Texas parcel with on-property substation access.

Capacity (modular)
10–50MW
PUE target
1.15
WUE (municipal)
0

Atmospheric water only.

Time to deploy
90days

From signed land lease.

Generation mix
70/30

Solar/grid backup.

Storage
4–8hours

Battery duration.

Workload support
Training & inference
Cooling
Liquid + AWG

Direct-to-chip optional.

90-day deployment

From land lease to first watt.

The modular form factor and pre-engineered building blocks compress a 24-month traditional data center timeline into a 90-day campaign.

Day 0

Land lease executed

Site selected, terms locked, option exercised.

Days 1–30

Civil and interconnection

Site grading, foundation, utility coordination, ERCOT interconnection paperwork in flight.

Days 30–60

Modules arrive

Pre-fabricated compute, power, and AWG blocks delivered. Cabling and mechanical hookups begin.

Days 60–90

Commissioning

Solar + storage commissioned. AWG commissioned. Compute pods brought online block by block.

Day 90

First watt delivered

PTO complete, full operational handoff or hosting begins.

Enterprise inquiry

For AI buyers, infrastructure investors, and hyperscale partners.

We engage on NDA from first call. Inquiries route directly to our development team and don't pass through a sales funnel.

Start an enterprise inquiry →