From land lease to first watt in 90 days.

Pre-engineered modular blocks, parallel-tracked civil and electrical work, and Texas-native execution compress what would otherwise take 18–24 months.

The advantage

Pre-engineered. Parallel-tracked. Texas-ready.

Traditional data centers are bespoke. Each site is a one-off design with a 12–18 month engineering cycle before construction even starts.

Modular changes the math. Pre-engineered compute, power, and AWG blocks ship as complete units. On-site work becomes civil, electrical hookup, and commissioning — measured in weeks, not years.

See the specs
Modular data center deployment

Phase by phase

What happens in each 30-day block.

Days 0–10

Mobilization

Land lease executed, permit applications filed with the AHJ, ERCOT interconnection coordination begins, equipment orders placed. Site survey and geotech completed in parallel.

Days 10–30

Civil & foundations

Site grading, access road, foundation pours for compute and power blocks. Underground conduits, water tank pads. Solar array racking begins on a parallel crew.

Days 30–45

Module delivery

Pre-fabricated modules arrive on flatbeds. Compute pods, power skids, AWG units, and battery containers set on foundations. Mechanical and electrical hookups begin.

Days 45–70

Solar + storage commissioning

PV strings energized and tested. Battery storage commissioned and tied into the campus microgrid. AWG units brought online; water quality validation begins.

Days 70–85

Compute commissioning

Compute pods energized block by block. Network and out-of-band management commissioned. Workload onboarding begins for hosted customers.

Days 85–90

PTO & handoff

Permission to Operate filed. Final commissioning report delivered. Operations transition: ongoing monitoring and on-call response by Aguasol crew.

What we ship

On Day 90, you receive.

01

Operational campus

Energized, commissioned, and producing capacity.

02

As-built drawings

Stamped electrical, mechanical, and civil documentation.

03

Commissioning report

Test data for every system, signed off.

04

O&M runbook

Procedures, escalation paths, contact tree.

05

Monitoring access

Live dashboard with all telemetry — power, water, compute, environmental.

06

Warranty stack

Equipment and workmanship warranties consolidated under one EPC contract.

Ready

Engage our development team under NDA.

Enterprise inquiry →